The Pool & Hot Tub Alliance (PHTA) is advancing revisions to four American National Standards covering water conservation, residential spas, and aboveground pools, with several projects reaching important milestones this fall. The standards are at different stages of development, ranging from recently completed public comment periods to the formation of a new writing committee.
The proposed revision of ANSI/ APSP/ICC-13 2017 — the Water Conservation Efficiency standard covering residential and public pools, spas, portable spas, and swim spas — reached the end of its 45-day public review period Nov. 2. The proposed revision adds requirements and guidance addressing evaporation mitigation, leak detection and response, water-conditioning devices, water reclamation and reuse, and other conservation measures.
Nonmandatory best practices previously included in the standard's appendices will be moved to a separate PHTA-13 Resource Guide. The Standard Writing Committee will now consider public comments as the revision process continues.
The proposed revision of ANSI/ APSP/ICC-3 2014 (R2023) — the standard for permanently installed residential spas and swim spas — completed its public review period Oct. 12. The revision focuses on harmonizing requirements with ANSI/ PHTA/ICC-5-2025, the residential inground swimming pool standard.
The Standard Writing Committee is continuing its work, with a meeting scheduled for Nov. 12. PHTA previously indicated that publication could occur as early as December 2026, depending on the consensus process.
The revision of ANSI/APSP/ICC-6 2013 (R2023) — covering residential portable spas and swim spas — is also underway. Its public review period closed July 6. The standard addresses the design, equipment, installation, and use of residential portable spas, exercise spas, and swim spas.
The committee is continuing to work through the revision process following the public comment period.
Meanwhile, PHTA has begun organizing a revision of ANSI/PHTA/ ICC-4 2025 — the standard for aboveground and onground residential swimming pools.
Announced Oct. 9, the limited revision will focus on updating child- resistance requirements. The standard addresses design, manufacturing, testing, care, and use of these pools and their components. PHTA invited manufacturers, retailers, water-safety advocates, regulatory representatives, and other stakeholders to apply for positions on the new Standard Writing Committee. Applications were due Nov. 6.
The committee's work is expected to take approximately seven months.
PHTA develops its standards through an American National Standards Institute (ANSI)-accredited, consensus-based process involving industry professionals and other affected stakeholders.
Public review and committee participation provide opportunities for industry members to contribute to requirements that influence pool and spa design, installation, equipment, and operation.